Rob was interested in an apartment for sale 'off the plan' with major stamp duty savings. He signed Section 32 and contract of sale, paid a deposit.
One of the special conditions required him to pay 'up to 10% of additional construction costs if the construction was over the building budget. The budget was not disclosed. How can I advise him what to do?