Under contract law, can an engineering design company charge (10K) for reviewing a design, and advising that there is nothing that they can do for the issues affecting the design?
Can they then use this claim to withhold current works which was a quoted scope?
Thanks.
Can they then use this claim to withhold current works which was a quoted scope?
Thanks.